United States › Grid › Interconnection queues › Minnesota

BATTERY STORAGE · MISO

Surplus; J1325

Surplus; J1325 is a 72.0 MW battery storage request in interconnection study in the MISO interconnection queue, in Rock County, Minnesota, connecting to ITC MIDWEST.

Queue statusIn planning
  1. PlanningQueued Feb 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
S1078
Grid region
MISO (Midcontinent)
Utility / transmission owner
ITC MIDWEST
Connection point (POI)
Magnolia
Location
Rock County, Minnesota
Technology
Battery: 72.0 MW
Total requested
72.0 MW
Queue status
Active
Entered queue
18 February 2025
Proposed online date
June 2027

Location

Marker shows the centre of Rock County; the queue data does not give exact sites.

Power plants in Minnesota · Transmission lines in Minnesota

Other requests in Rock County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem