United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
SOLAR Β· MISOSolar project J3397, Rock County
Solar project J3397, Rock County is a 80.0 MW solar request withdrawn in the MISO interconnection queue, in Rock County, Minnesota, connecting to ITC MIDWEST.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2024 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3397
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC MIDWEST
- Connection point (POI)
- Magnolia
- Location
- Rock County, Minnesota
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 18 March 2024
- Proposed online date
- August 2026
- Withdrawn
- December 2025
Location
Marker shows the centre of Rock County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Rock County
- Solar project J1325, Rock CountySolar Β· 200 MW Β· under construction
- Onshore wind project J569, Rock CountyOnshore wind Β· 100 MW Β· agreement signed
- Solar project J1164, Rock CountySolar Β· 80.0 MW Β· agreement signed
- Surplus; J1325Battery storage Β· 72.0 MW Β· in study
- Onshore wind project J183, Rock CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project G253, Rock CountyOnshore wind Β· 12.0 MW Β· built
- Solar project J1570, Rock CountySolar Β· 200 MW Β· withdrawn
- Onshore wind project J184, Rock CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project G893, Rock CountyOnshore wind Β· 80.0 MW Β· withdrawn
- Onshore wind project G576, Rock CountyOnshore wind Β· 40.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem