Onshore wind project G576, Rock County

Onshore wind project G576, Rock County is a 40.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Rock County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2005 (completed)
  2. Withdrawn / abandonedApr 2010 (project stopped here)
  3. ConsentedApr 2010 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G576
Grid region
MISO (Midcontinent)
Connection point (POI)
Split Rock - Magnolia 161 kV
Location
Rock County, Minnesota
Technology
Wind: 40.0 MW
Total requested
40.0 MW
Study phase
Network Upgrade
Queue status
Withdrawn
Entered queue
12 December 2005
Agreement signed
20 April 2010
Proposed online date
December 2007
Withdrawn
April 2010

Location

Marker shows the centre of Rock County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Rock County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem