Azalea Solar - Site 2*

Azalea Solar - Site 2* is a 8.0 MW solar request built and operating in the Southeast interconnection queue, in Washington County, Georgia, connecting to Georgia Transmission.

Queue statusOperating
  1. PlanningQueued Dec 2023 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
GI-074
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Georgia Transmission
Connection point (POI)
Pervis Road 46 kV Sub
Location
Washington County, Georgia
Technology
Solar: 8.0 MW
Total requested
8.0 MW
Study phase
IA Executed
Queue status
Operational
Entered queue
31 December 2023

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Georgia · Transmission lines in Georgia

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem