United States βΊ Grid βΊ Interconnection queues βΊ Georgia
GAS Β· SOUTHEASTGas project IC-075, Washington County
Gas project IC-075, Washington County is a 620 MW gas request withdrawn in the Southeast interconnection queue, in Washington County, Georgia, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-075
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- Scherer - Vogtle 500 kV Line
- Location
- Washington County, Georgia
- Technology
- Gas: 620 MW
- Total requested
- 620 MW
- Service type
- Energy only (ERIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
Location
Marker shows the centre of Washington County; the queue data does not give exact sites.
Other requests in Washington County
- Solar project IC-1152, Washington CountySolar Β· 200 MW Β· agreement signed
- Washington County SolarSolar + storage Β· 203 MW Β· in study
- Cherry Tree SolarSolar + storage Β· 150 MW Β· in study
- SR WarthenSolar Β· 135 MW Β· in study
- Duke-Sandersville CTGas Β· 640 MW Β· built
- LGE Washington (aka Tiger Creek)Gas Β· 480 MW Β· built
- Washington County SolarSolar Β· 150 MW Β· built
- Tiger Creek (aka GI-16)Gas Β· 12.0 MW Β· built
- Azalea Solar - Site 2*Solar Β· 8.0 MW Β· built
- Gas project IC-048, Washington CountyGas Β· 640 MW Β· withdrawn
- Gas project IC-084, Washington CountyGas Β· 620 MW Β· withdrawn
- Solar project 25-IC-AK, Washington CountySolar Β· 250 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem