United States βΊ Grid βΊ Interconnection queues βΊ Indiana
BATTERY STORAGE Β· PJMBattery storage project AF1-046, Elkhart County
Battery storage project AF1-046, Elkhart County is a 52.2 MW battery storage request withdrawn in the PJM interconnection queue, in Elkhart County, Indiana, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2019 (completed)
- Withdrawn / abandonedSep 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF1-046
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Twin Branch-Guardian 138 kV
- Location
- Elkhart County, Indiana
- Technology
- Battery: 52.2 MW
- Total requested
- 52.2 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 28 June 2019
- Proposed online date
- December 2023
- Withdrawn
- September 2023
Location
Marker shows the centre of Elkhart County; the queue data does not give exact sites.
Other requests in Elkhart County
- Elkhart County Solar ProjectSolar Β· 100 MW Β· agreement signed
- Battery storage project AG2-332, Elkhart CountyBattery storage Β· 100 MW Β· in study
- Battery storage project AG2-248, Elkhart CountyBattery storage Β· 100 MW Β· in study
- Wabash Valley Power Association, Inc.Other Β· 4.8 MW Β· built
- Battery storage project AE2-332, Elkhart CountyBattery storage Β· 209 MW Β· withdrawn
- Battery storage project AG1-222, Elkhart CountyBattery storage Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem