BATTERY STORAGE Β· PJM

Battery storage project AG1-222, Elkhart County

Battery storage project AG1-222, Elkhart County is a 150 MW battery storage request withdrawn in the PJM interconnection queue, in Elkhart County, Indiana, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2020 (completed)
  2. Withdrawn / abandonedJan 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG1-222
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Guardian-Twin Branch 138 kV
Location
Elkhart County, Indiana
Technology
Battery: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study
Queue status
Withdrawn
Entered queue
23 September 2020
Proposed online date
May 2023
Withdrawn
January 2025

Location

Marker shows the centre of Elkhart County; the queue data does not give exact sites.

Power plants in Indiana Β· Transmission lines in Indiana

Other requests in Elkhart County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem