United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· MISOSolar project J2103, Jasper County
Solar project J2103, Jasper County is a 100 MW solar request withdrawn in the MISO interconnection queue, in Jasper County, Texas, connecting to ENTERGY TEXAS, INC..
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedDec 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2103
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY TEXAS, INC.
- Connection point (POI)
- Buna SW to Call Transmission Line
- Location
- Jasper County, Texas
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process
- Queue status
- Withdrawn
- Entered queue
- 1 September 2021
- Proposed online date
- October 2024
- Withdrawn
- December 2021
Location
Marker shows the centre of Jasper County; the queue data does not give exact sites.
Other requests in Jasper County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem