Solar project J3425, Jasper County

Solar project J3425, Jasper County is a 59.2 MW solar request withdrawn in the MISO interconnection queue, in Jasper County, Texas, connecting to EAST TEXAS ELECTRIC COOPERATIVE, INC..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedSep 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3425
Grid region
MISO (Midcontinent)
Utility / transmission owner
EAST TEXAS ELECTRIC COOPERATIVE, INC.
Connection point (POI)
Peachtree Substation
Location
Jasper County, Texas
Technology
Solar: 59.2 MW
Total requested
59.2 MW
Service type
Energy only (ERIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
10 April 2024
Proposed online date
June 2027
Withdrawn
September 2025

Location

Marker shows the centre of Jasper County; the queue data does not give exact sites.