United States βΊ Grid βΊ Interconnection queues βΊ Utah
SOLAR Β· WESTSolar project 822, Sanpete County
Solar project 822, Sanpete County is a 30.0 MW solar request withdrawn in the West interconnection queue, in Sanpete County, Utah, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2016 (completed)
- Withdrawn / abandoned (project stopped here)
- ConsentedOct 2019 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 822
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Developer
- PacifiCorp Energy Supply Management
- Connection point (POI)
- Gunnison-Sigurd #1 transmission line
- Location
- Sanpete County, Utah
- Technology
- Solar: 30.0 MW
- Total requested
- 30.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- IA executed 10/17/19. Suspended 10/20/22, IA terminated 10/21/25
- Queue status
- Withdrawn
- Entered queue
- 15 November 2016
- Agreement signed
- 17 October 2019
- Proposed online date
- February 2018
Location
Marker shows the centre of Sanpete County; the queue data does not give exact sites.
Other requests in Sanpete County
- Battery storage project C2-20, Sanpete CountyBattery storage Β· 500 MW Β· withdrawn
- Battery storage project C3-064, Sanpete CountyBattery storage Β· 500 MW Β· withdrawn
- Solar + storage project C4-043, Sanpete CountySolar + storage Β· 300 MW Β· withdrawn
- Solar project PIS020, Sanpete CountySolar Β· 30.0 MW Β· withdrawn
- Other project 404, Sanpete CountyOther Β· 11.8 MW Β· withdrawn
- Hydro project 417, Sanpete CountyHydro Β· 1.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem