United States βΊ Grid βΊ Interconnection queues βΊ Utah
SOLAR + STORAGE Β· WESTSolar + storage project C4-043, Sanpete County
Solar + storage project C4-043, Sanpete County is a 300 MW solar + storage request withdrawn in the West interconnection queue, in Sanpete County, Utah, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C4-043
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Clover - Sigurd #2 transmission line
- Location
- Sanpete County, Utah
- Technology
- Solar: 300 MW Β· Battery
- Total requested
- 300 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 15 May 2024
- Proposed online date
- January 2029
Location
Marker shows the centre of Sanpete County; the queue data does not give exact sites.
Other requests in Sanpete County
- Battery storage project C2-20, Sanpete CountyBattery storage Β· 500 MW Β· withdrawn
- Battery storage project C3-064, Sanpete CountyBattery storage Β· 500 MW Β· withdrawn
- Solar project PIS020, Sanpete CountySolar Β· 30.0 MW Β· withdrawn
- Solar project 822, Sanpete CountySolar Β· 30.0 MW Β· withdrawn
- Other project 404, Sanpete CountyOther Β· 11.8 MW Β· withdrawn
- Hydro project 417, Sanpete CountyHydro Β· 1.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem