United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

SOLAR Β· WEST

Solar project PIS020, Sanpete County

Solar project PIS020, Sanpete County is a 30.0 MW solar request withdrawn in the West interconnection queue, in Sanpete County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
PIS020
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Developer
PacifiCorp
Connection point (POI)
Gunnison-Sigurd #1 transmission line
Location
Sanpete County, Utah
Technology
Solar: 30.0 MW
Total requested
30.0 MW
Service type
NRIS and ERIS
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
24 June 2022
Proposed online date
May 2026

Location

Marker shows the centre of Sanpete County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Sanpete County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem