BATTERY STORAGE Β· WESTBattery storage project C2-20, Sanpete County
Battery storage project C2-20, Sanpete County is a 500 MW battery storage request withdrawn in the West interconnection queue, in Sanpete County, Utah, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2022 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C2-20
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Developer
- PacifiCorp
- Connection point (POI)
- Camp Williams-Four Corners transmission line
- Location
- Sanpete County, Utah
- Technology
- Other Storage: 500 MW
- Total requested
- 500 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 7 April 2022
- Proposed online date
- June 2028
Location
Marker shows the centre of Sanpete County; the queue data does not give exact sites.
Other requests in Sanpete County
- Battery storage project C3-064, Sanpete CountyBattery storage Β· 500 MW Β· withdrawn
- Solar + storage project C4-043, Sanpete CountySolar + storage Β· 300 MW Β· withdrawn
- Solar project PIS020, Sanpete CountySolar Β· 30.0 MW Β· withdrawn
- Solar project 822, Sanpete CountySolar Β· 30.0 MW Β· withdrawn
- Other project 404, Sanpete CountyOther Β· 11.8 MW Β· withdrawn
- Hydro project 417, Sanpete CountyHydro Β· 1.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem