United States › Grid › Interconnection queues › Washington
GAS · WESTPierce County Project No 2
Pierce County Project No 2 is a 170 MW gas request withdrawn in the West interconnection queue, in Pierce County, Washington, connecting to Duke Energy North America, LLC.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2001 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G52
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Duke Energy North America, LLC
- Developer
- Duke Energy North America, LLC
- Connection point (POI)
- South Tacoma 230 kV Substation
- Location
- Pierce County, Washington
- Technology
- Gas: 170 MW
- Total requested
- 170 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 3 May 2001
- Proposed online date
- January 2003
Location
Marker shows the centre of Pierce County; the queue data does not give exact sites.
Power plants in Washington · Transmission lines in Washington
Other requests in Pierce County
- Battery storage project 98, Pierce CountyBattery storage · 200 MW · agreement signed
- Battery storage project 60, Pierce CountyBattery storage · 200 MW · agreement signed
- Battery storage project 100, Pierce CountyBattery storage · 200 MW · suspended
- Battery storage project 81, Pierce CountyBattery storage · 100 MW · suspended
- Battery storage project 124, Pierce CountyBattery storage · 85.0 MW · suspended
- Gas project 20, Pierce CountyGas · 340 MW · withdrawn
- Gas project 8, Pierce CountyGas · 309 MW · withdrawn
- Frederickson Power LPGas · 300 MW · withdrawn
- 250MW Covington-Chehalis,Tacoma-OlympiaGas · 250 MW · withdrawn
- Other project G2021-01, Pierce CountyOther · 215 MW · withdrawn
- Battery storage project 107, Pierce CountyBattery storage · 200 MW · withdrawn
- Pierce County Project No 1Gas · 170 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem