GAS Β· WESTFrederickson Power LP
Frederickson Power LP is a 300 MW gas request withdrawn in the West interconnection queue, in Pierce County, Washington, connecting to Frederickson Power, LP.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2001 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G70
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Frederickson Power, LP
- Developer
- Frederickson Power, LP
- Connection point (POI)
- South Tacoma Substation.
- Location
- Pierce County, Washington
- Technology
- Gas: 300 MW
- Total requested
- 300 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 24 July 2001
- Proposed online date
- October 2002
Location
Marker shows the centre of Pierce County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Pierce County
- Battery storage project 98, Pierce CountyBattery storage Β· 200 MW Β· agreement signed
- Battery storage project 60, Pierce CountyBattery storage Β· 200 MW Β· agreement signed
- Battery storage project 100, Pierce CountyBattery storage Β· 200 MW Β· suspended
- Battery storage project 81, Pierce CountyBattery storage Β· 100 MW Β· suspended
- Battery storage project 124, Pierce CountyBattery storage Β· 85.0 MW Β· suspended
- Gas project 20, Pierce CountyGas Β· 340 MW Β· withdrawn
- Gas project 8, Pierce CountyGas Β· 309 MW Β· withdrawn
- 250MW Covington-Chehalis,Tacoma-OlympiaGas Β· 250 MW Β· withdrawn
- Other project G2021-01, Pierce CountyOther Β· 215 MW Β· withdrawn
- Battery storage project 107, Pierce CountyBattery storage Β· 200 MW Β· withdrawn
- Pierce County Project No 1Gas Β· 170 MW Β· withdrawn
- Pierce County Project No 2Gas Β· 170 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem