United States βΊ Grid βΊ Interconnection queues βΊ Washington
BATTERY STORAGE Β· WESTBattery storage project 107, Pierce County
Battery storage project 107, Pierce County is a 200 MW battery storage request withdrawn in the West interconnection queue, in Pierce County, Washington, connecting to Puget Sound Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 107
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Puget Sound Energy
- Connection point (POI)
- White River 115-kV
- Location
- Pierce County, Washington
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 20 April 2021
- Proposed online date
- June 2023
Location
Marker shows the centre of Pierce County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Pierce County
- Battery storage project 98, Pierce CountyBattery storage Β· 200 MW Β· agreement signed
- Battery storage project 60, Pierce CountyBattery storage Β· 200 MW Β· agreement signed
- Battery storage project 100, Pierce CountyBattery storage Β· 200 MW Β· suspended
- Battery storage project 81, Pierce CountyBattery storage Β· 100 MW Β· suspended
- Battery storage project 124, Pierce CountyBattery storage Β· 85.0 MW Β· suspended
- Gas project 20, Pierce CountyGas Β· 340 MW Β· withdrawn
- Gas project 8, Pierce CountyGas Β· 309 MW Β· withdrawn
- Frederickson Power LPGas Β· 300 MW Β· withdrawn
- 250MW Covington-Chehalis,Tacoma-OlympiaGas Β· 250 MW Β· withdrawn
- Other project G2021-01, Pierce CountyOther Β· 215 MW Β· withdrawn
- Pierce County Project No 1Gas Β· 170 MW Β· withdrawn
- Pierce County Project No 2Gas Β· 170 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem