Battery storage project 100, Pierce County

Battery storage project 100, Pierce County is a 200 MW battery storage request suspended in the West interconnection queue, in Pierce County, Washington, connecting to Puget Sound Energy.

Queue statusPaused / redesign
  1. PlanningQueued Apr 2021 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
100
Grid region
West (non-ISO utilities)
Utility / transmission owner
Puget Sound Energy
Connection point (POI)
White River 115 kV Substation
Location
Pierce County, Washington
Technology
Battery: 200 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Study phase
Suspended LGIA
Queue status
Suspended
Entered queue
15 April 2021
Proposed online date
September 2028

Location

Marker shows the centre of Pierce County; the queue data does not give exact sites.

Power plants in Washington · Transmission lines in Washington

Other requests in Pierce County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem