United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
ONSHORE WIND Β· WESTOnshore wind project GI-0719, Wilkin County
Onshore wind project GI-0719, Wilkin County is a 201 MW onshore wind request withdrawn in the West interconnection queue, in Wilkin County, Minnesota, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2007 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-0719
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Moorhead-Morris 230kV
- Location
- Wilkin County, Minnesota
- Technology
- Wind: 201 MW
- Total requested
- 201 MW
- Service type
- Network resource (NRIS)
- Study phase
- IAP
- Queue status
- Withdrawn
- Entered queue
- 3 October 2007
- Proposed online date
- December 2011
Location
Marker shows the centre of Wilkin County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Wilkin County
- Battery storage project J2492, Wilkin CountyBattery storage Β· 300 MW Β· withdrawn
- Onshore wind project J3956, Wilkin CountyOnshore wind Β· 240 MW Β· withdrawn
- Onshore wind project G913, Wilkin CountyOnshore wind Β· 201 MW Β· withdrawn
- Onshore wind project H031, Wilkin CountyOnshore wind Β· 160 MW Β· withdrawn
- Onshore wind project J035, Wilkin CountyOnshore wind Β· 4.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem