BATTERY STORAGE Β· MISOBattery storage project J2492, Wilkin County
Battery storage project J2492, Wilkin County is a 300 MW battery storage request withdrawn in the MISO interconnection queue, in Wilkin County, Minnesota, connecting to OTTER TAIL POWER COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2492
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- OTTER TAIL POWER COMPANY
- Connection point (POI)
- Wahpeton 230kV
- Location
- Wilkin County, Minnesota
- Technology
- Battery: 300 MW
- Total requested
- 300 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 15 September 2022
- Proposed online date
- October 2024
- Withdrawn
- October 2025
Location
Marker shows the centre of Wilkin County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Wilkin County
- Onshore wind project J3956, Wilkin CountyOnshore wind Β· 240 MW Β· withdrawn
- Onshore wind project G913, Wilkin CountyOnshore wind Β· 201 MW Β· withdrawn
- Onshore wind project GI-0719, Wilkin CountyOnshore wind Β· 201 MW Β· withdrawn
- Onshore wind project H031, Wilkin CountyOnshore wind Β· 160 MW Β· withdrawn
- Onshore wind project J035, Wilkin CountyOnshore wind Β· 4.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem