BATTERY STORAGE Β· SPPBattery storage project GEN-2018-036, Scotts Bluff County
Battery storage project GEN-2018-036, Scotts Bluff County is a 200 MW battery storage request withdrawn in the SPP interconnection queue, in Scotts Bluff County, Nebraska, connecting to WAPA.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2018 (completed)
- Withdrawn / abandonedAug 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingOct 2023 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2018-036
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WAPA
- Connection point (POI)
- Stegall 230kV Substation
- Location
- Scotts Bluff County, Nebraska
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 29 May 2018
- Proposed online date
- October 2023
- Came online
- October 2023
- Withdrawn
- August 2022
Location
Marker shows the centre of Scotts Bluff County; the queue data does not give exact sites.
Other requests in Scotts Bluff County
- Solar project GEN-2024-374, Scotts Bluff CountySolar Β· 225 MW Β· in study
- Onshore wind project GI-0816, Scotts Bluff CountyOnshore wind Β· 204 MW Β· withdrawn
- Solar project GEN-2022-061, Scotts Bluff CountySolar Β· 180 MW Β· withdrawn
- Solar project GEN-2016-093, Scotts Bluff CountySolar Β· 70.0 MW Β· withdrawn
- Solar project GEN-2017-037, Scotts Bluff CountySolar Β· 20.0 MW Β· withdrawn
- Gas project GEN-2007-012N, Scotts Bluff CountyGas Β· 8.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem