ONSHORE WIND Β· WESTOnshore wind project GI-0816, Scotts Bluff County
Onshore wind project GI-0816, Scotts Bluff County is a 204 MW onshore wind request withdrawn in the West interconnection queue, in Scotts Bluff County, Nebraska, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2008 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-0816
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Stegall 230kV
- Location
- Scotts Bluff County, Nebraska
- Technology
- Wind: 204 MW
- Total requested
- 204 MW
- Service type
- NRIS and ERIS
- Study phase
- IAP
- Queue status
- Withdrawn
- Entered queue
- 7 July 2008
- Proposed online date
- September 2010
Location
Marker shows the centre of Scotts Bluff County; the queue data does not give exact sites.
Other requests in Scotts Bluff County
- Solar project GEN-2024-374, Scotts Bluff CountySolar Β· 225 MW Β· in study
- Battery storage project GEN-2018-036, Scotts Bluff CountyBattery storage Β· 200 MW Β· withdrawn
- Solar project GEN-2022-061, Scotts Bluff CountySolar Β· 180 MW Β· withdrawn
- Solar project GEN-2016-093, Scotts Bluff CountySolar Β· 70.0 MW Β· withdrawn
- Solar project GEN-2017-037, Scotts Bluff CountySolar Β· 20.0 MW Β· withdrawn
- Gas project GEN-2007-012N, Scotts Bluff CountyGas Β· 8.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem