ONSHORE WIND Β· SPPOnshore wind project GEN-2005-016, Elk County
Onshore wind project GEN-2005-016, Elk County is a 150 MW onshore wind request withdrawn in the SPP interconnection queue, in Elk County, Kansas, connecting to WERE.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2005 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2005-016
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WERE
- Location
- Elk County, Kansas
- Technology
- Wind: 150 MW
- Total requested
- 150 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 14 September 2005
- Proposed online date
- December 2006
Location
Marker shows the centre of Elk County; the queue data does not give exact sites.
Other requests in Elk County
- Solar project GEN-2024-125, Elk CountySolar Β· 400 MW Β· in study
- Onshore wind project GEN-2005-013, Elk CountyOnshore wind Β· 200 MW Β· built
- Solar project GEN-2023-200, Elk CountySolar Β· 300 MW Β· withdrawn
- Onshore wind project GEN-2004-024, Elk CountyOnshore wind Β· 201 MW Β· withdrawn
- Onshore wind project GEN-2004-002, Elk CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2010-013, Elk CountyOnshore wind Β· 50.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem