SOLAR · SPPSolar project GEN-2024-125, Elk County
Solar project GEN-2024-125, Elk County is a 400 MW solar request in interconnection study in the SPP interconnection queue, in Elk County, Kansas, connecting to WERE.
Queue statusIn planning
- PlanningQueued Mar 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2024-125
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WERE
- Connection point (POI)
- Neosho Ridge - Caney River 345 kV Line
- Location
- Elk County, Kansas
- Technology
- Solar: 400 MW
- Total requested
- 400 MW
- Service type
- NRIS and ERIS
- Study phase
- DISIS STAGE
- Queue status
- Active
- Entered queue
- 1 March 2025
- Proposed online date
- June 2028
Location
Marker shows the centre of Elk County; the queue data does not give exact sites.
Other requests in Elk County
- Onshore wind project GEN-2005-013, Elk CountyOnshore wind · 200 MW · built
- Solar project GEN-2023-200, Elk CountySolar · 300 MW · withdrawn
- Onshore wind project GEN-2004-024, Elk CountyOnshore wind · 201 MW · withdrawn
- Onshore wind project GEN-2004-002, Elk CountyOnshore wind · 200 MW · withdrawn
- Onshore wind project GEN-2005-016, Elk CountyOnshore wind · 150 MW · withdrawn
- Onshore wind project GEN-2010-013, Elk CountyOnshore wind · 50.4 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem