United States βΊ Grid βΊ Interconnection queues βΊ Kansas
SOLAR Β· SPPSolar project GEN-2023-200, Elk County
Solar project GEN-2023-200, Elk County is a 300 MW solar request withdrawn in the SPP interconnection queue, in Elk County, Kansas, connecting to Evergy.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedApr 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2023-200
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- Evergy
- Connection point (POI)
- Caney River 345 kV Substation
- Location
- Elk County, Kansas
- Technology
- Solar: 300 MW
- Total requested
- 300 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 2 October 2023
- Proposed online date
- October 2028
- Withdrawn
- April 2024
Location
Marker shows the centre of Elk County; the queue data does not give exact sites.
Other requests in Elk County
- Solar project GEN-2024-125, Elk CountySolar Β· 400 MW Β· in study
- Onshore wind project GEN-2005-013, Elk CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project GEN-2004-024, Elk CountyOnshore wind Β· 201 MW Β· withdrawn
- Onshore wind project GEN-2004-002, Elk CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2005-016, Elk CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project GEN-2010-013, Elk CountyOnshore wind Β· 50.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem