SOLAR + STORAGE · MISOSolar + storage project J2897, San Jacinto County
Solar + storage project J2897, San Jacinto County is a 150 MW solar + storage request in interconnection study in the MISO interconnection queue, in San Jacinto County, Texas, connecting to ENTERGY TEXAS, INC..
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Apr 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J2897
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY TEXAS, INC.
- Connection point (POI)
- RIVTRIN - SHECO CALVIN 138.0kV
- Location
- San Jacinto County, Texas
- Technology
- Solar: 150 MW · Battery
- Total requested
- 150 MW
- Service type
- Energy only (ERIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 15 September 2022
- Proposed online date
- April 2025
Location
Marker shows the centre of San Jacinto County; the queue data does not give exact sites.
Other requests in San Jacinto County
- Gas project E0032, San Jacinto CountyGas · 478 MW · in study
- Gas project J487, San Jacinto CountyGas · 999 MW · withdrawn
- Solar + storage project J2076, San Jacinto CountySolar + storage · 225 MW · withdrawn
- Solar project J1186, San Jacinto CountySolar · 100 MW · withdrawn
- Battery storage project J2235, San Jacinto CountyBattery storage · 100 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem