United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

BATTERY STORAGE Β· MISO

Battery storage project J2235, San Jacinto County

Battery storage project J2235, San Jacinto County is a 100 MW battery storage request withdrawn in the MISO interconnection queue, in San Jacinto County, Texas, connecting to EAST TEXAS ELECTRIC COOPERATIVE, INC..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2021 (completed)
  2. Withdrawn / abandonedMar 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2235
Grid region
MISO (Midcontinent)
Utility / transmission owner
EAST TEXAS ELECTRIC COOPERATIVE, INC.
Connection point (POI)
Shepherd Substation
Location
San Jacinto County, Texas
Technology
Battery: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA In Process; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
17 August 2021
Proposed online date
December 2022
Withdrawn
March 2025

Location

Marker shows the centre of San Jacinto County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in San Jacinto County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem