United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Aquamarine Solar

Aquamarine Solar is a 152 MW solar request withdrawn in the ERCOT interconnection queue, in Dickens County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2019 (completed)
  2. Withdrawn / abandonedJan 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0314
Grid region
ERCOT (Texas)
Developer
BdPU Texas Solar Project II, LLC
Connection point (POI)
tap 138kV 720 Salt Creek Reactor β€šΓ„Γ¬ 6150 Spur
Location
Dickens County, Texas
Technology
Solar: 152 MW
Total requested
152 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
9 May 2019
Proposed online date
October 2025
Withdrawn
January 2024

Location

Marker shows the centre of Dickens County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Dickens County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem