United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

OTHER Β· MISO

Surplus; Polaris Solar

Surplus; Polaris Solar is a 100 MW other request withdrawn in the MISO interconnection queue, in Gratiot County, Michigan, connecting to METC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
S1011
Grid region
MISO (Midcontinent)
Utility / transmission owner
METC
Connection point (POI)
Slate 345 kV Sub (256573)
Location
Gratiot County, Michigan
Technology
Solar: 100 MW Β· Other
Total requested
100 MW
Queue status
Withdrawn
Entered queue
15 October 2021
Proposed online date
September 2023

Location

Marker shows the centre of Gratiot County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in Gratiot County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem