United States › Grid › Interconnection queues › Pennsylvania
SOLAR · PJMSolar project AG2-200, Warren County
Solar project AG2-200, Warren County is a 17.0 MW solar request in interconnection study in the PJM interconnection queue, in Warren County, Pennsylvania, connecting to PENELEC.
- PlanningQueued Feb 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jan 2023 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AG2-200
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Developer
- Sugaree Solar LLC
- Connection point (POI)
- North Warren - Russell 34.5 kV
- Location
- Warren County, Pennsylvania
- Technology
- Solar: 17.0 MW
- Total requested
- 17.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Active
- Entered queue
- 6 February 2025
- Proposed online date
- January 2023
Location
Marker shows the centre of Warren County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Warren County
- Warren Generating StationGas · 57.0 MW · built
- Seneca Pumped Storage Generating StationHydro · 17.0 MW · built
- Seneca Pumped Storage Generating Station Unit 1Hydro · 16.0 MW · built
- Seneca Pumped Generating Station Unit 2Hydro · 16.0 MW · built
- Warren Generating StationGas · 5.0 MW · built
- Gas project B49, Warren CountyGas · 500 MW · withdrawn
- Gas project G40, Warren CountyGas · 260 MW · withdrawn
- Gas project B20, Warren CountyGas · 70.0 MW · withdrawn
- United Refining Company Oil RefineryGas · 29.0 MW · withdrawn
- Solar + storage project AF1-103, Warren CountySolar + storage · 20.0 MW · withdrawn
- Solar + storage project AG1-481, Warren CountySolar + storage · 15.5 MW · withdrawn
- Solar project AH2-318, Warren CountySolar · 10.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem