United States › Grid › Interconnection queues › Pennsylvania
GAS · PJMUnited Refining Company Oil Refinery
United Refining Company Oil Refinery is a 29.0 MW gas request withdrawn in the PJM interconnection queue, in Warren County, Pennsylvania, connecting to PENELEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2012 (completed)
- Withdrawn / abandonedFeb 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Y2-055
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- Elm Street 34.5kV
- Location
- Warren County, Pennsylvania
- Technology
- Gas: 29.0 MW
- Total requested
- 29.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 16 August 2012
- Proposed online date
- January 2018
- Withdrawn
- February 2019
Location
Marker shows the centre of Warren County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Warren County
- Solar project AG2-200, Warren CountySolar · 17.0 MW · in study
- Warren Generating StationGas · 57.0 MW · built
- Seneca Pumped Storage Generating StationHydro · 17.0 MW · built
- Seneca Pumped Storage Generating Station Unit 1Hydro · 16.0 MW · built
- Seneca Pumped Generating Station Unit 2Hydro · 16.0 MW · built
- Warren Generating StationGas · 5.0 MW · built
- Gas project B49, Warren CountyGas · 500 MW · withdrawn
- Gas project G40, Warren CountyGas · 260 MW · withdrawn
- Gas project B20, Warren CountyGas · 70.0 MW · withdrawn
- Solar + storage project AF1-103, Warren CountySolar + storage · 20.0 MW · withdrawn
- Solar + storage project AG1-481, Warren CountySolar + storage · 15.5 MW · withdrawn
- Solar project AH2-318, Warren CountySolar · 10.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem