SOLAR Β· SPPSolar project GEN-2018-073, Floyd County
Solar project GEN-2018-073, Floyd County is a 250 MW solar request withdrawn in the SPP interconnection queue, in Floyd County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2018 (completed)
- Withdrawn / abandonedSep 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2018-073
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- 345kV Crawfish Substation
- Location
- Floyd County, Texas
- Technology
- Solar: 250 MW
- Total requested
- 250 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 24 October 2018
- Proposed online date
- October 2026
- Withdrawn
- September 2023
Location
Marker shows the centre of Floyd County; the queue data does not give exact sites.
Other requests in Floyd County
- Onshore wind project GEN-2024-042, Floyd CountyOnshore wind Β· 250 MW Β· in study
- Onshore wind project GEN-2024-041, Floyd CountyOnshore wind Β· 250 MW Β· in study
- Onshore wind project GEN-2014-007, Floyd CountyOnshore wind Β· 400 MW Β· withdrawn
- Onshore wind project GEN-2008-130, Floyd CountyOnshore wind Β· 300 MW Β· withdrawn
- Solar project GEN-2015-070, Floyd CountySolar Β· 300 MW Β· withdrawn
- Pumpkin Farm WindOnshore wind Β· 281 MW Β· withdrawn
- Onshore wind project GEN-2004-004, Floyd CountyOnshore wind Β· 240 MW Β· withdrawn
- Gas project GEN-2012-038, Floyd CountyGas Β· 203 MW Β· withdrawn
- Onshore wind project GEN-2015-033, Floyd CountyOnshore wind Β· 152 MW Β· withdrawn
- Onshore wind project GEN-2014-074, Floyd CountyOnshore wind Β· 152 MW Β· withdrawn
- Onshore wind project GEN-2008-015, Floyd CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project GEN-2008-014, Floyd CountyOnshore wind Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem