SOLAR Β· SOUTHEASTSolar project 495, Palm Beach County
Solar project 495, Palm Beach County is a 74.5 MW solar request withdrawn in the Southeast interconnection queue, in Palm Beach County, Florida, connecting to Florida Power & Light.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 495
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Florida Power & Light
- Developer
- FPL
- Connection point (POI)
- Western Palm Beach County
- Location
- Palm Beach County, Florida
- Technology
- Solar: 74.5 MW
- Total requested
- 74.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Entered queue
- 6 January 2023
- Proposed online date
- January 2027
Location
Marker shows the centre of Palm Beach County; the queue data does not give exact sites.
Other requests in Palm Beach County
- Solar project 260Solar Β· 74.5 MW Β· built
- Solar project 294, Palm Beach CountySolar Β· 74.5 MW Β· built
- Solar project 263, Palm Beach CountySolar Β· 74.5 MW Β· built
- Solar project 269, Palm Beach CountySolar Β· 74.5 MW Β· built
- Solar project 553, Palm Beach CountySolar Β· 74.5 MW Β· withdrawn
- Solar project 317, Palm Beach CountySolar Β· 74.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem