United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
BATTERY STORAGE Β· SOUTHEASTBattery storage project 956518, Cumberland County
Battery storage project 956518, Cumberland County is a 50.0 MW battery storage request withdrawn in the Southeast interconnection queue, in Cumberland County, North Carolina, connecting to Duke Energy Progress.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 956518
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Progress
- Developer
- Duke Energy Progress LLC
- Connection point (POI)
- Fayetteville 230kV Substation; 115kV Bus
- Location
- Cumberland County, North Carolina
- Technology
- Battery: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- NRIS and ERIS
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 19 June 2024
Location
Marker shows the centre of Cumberland County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Cumberland County
- Solar project 977882, Cumberland CountySolar Β· 74.9 MW Β· in study
- Other project PP00050, Cumberland CountyOther Β· 65.0 MW Β· in study
- Solar project 963044, Cumberland CountySolar Β· 65.0 MW Β· in study
- Gas project 24745, Cumberland CountyGas Β· 1,235 MW Β· withdrawn
- Gas project 24735, Cumberland CountyGas Β· 1,235 MW Β· withdrawn
- Solar project 958349, Cumberland CountySolar Β· 157 MW Β· withdrawn
- Solar project 962974, Cumberland CountySolar Β· 74.9 MW Β· withdrawn
- Solar project 568222, Cumberland CountySolar Β· 74.9 MW Β· withdrawn
- Solar project 918039, Cumberland CountySolar Β· 74.9 MW Β· withdrawn
- Other project 132808, Cumberland CountyOther Β· 38.0 MW Β· withdrawn
- Solar project 954798, Cumberland CountySolar Β· 31.6 MW Β· withdrawn
- Solar project 8359, Cumberland CountySolar Β· 30.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem