United States › Grid › Interconnection queues › North Carolina
OTHER · SOUTHEASTOther project PP00050, Cumberland County
Other project PP00050, Cumberland County is a 65.0 MW other request in interconnection study in the Southeast interconnection queue, in Cumberland County, North Carolina, connecting to Duke Energy Progress.
- PlanningQueued Sep 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jan 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- PP00050
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Progress
- Connection point (POI)
- Clinton - Vander 115
- Location
- Cumberland County, North Carolina
- Technology
- Other: 65.0 MW
- Total requested
- 65.0 MW
- Study phase
- Tender Provisional Study Agreement
- Queue status
- Active
- Entered queue
- 12 September 2025
- Proposed online date
- January 2029
Location
Marker shows the centre of Cumberland County; the queue data does not give exact sites.
Power plants in North Carolina · Transmission lines in North Carolina
Other requests in Cumberland County
- Solar project 977882, Cumberland CountySolar · 74.9 MW · in study
- Solar project 963044, Cumberland CountySolar · 65.0 MW · in study
- Gas project 24745, Cumberland CountyGas · 1,235 MW · withdrawn
- Gas project 24735, Cumberland CountyGas · 1,235 MW · withdrawn
- Solar project 958349, Cumberland CountySolar · 157 MW · withdrawn
- Solar project 962974, Cumberland CountySolar · 74.9 MW · withdrawn
- Solar project 568222, Cumberland CountySolar · 74.9 MW · withdrawn
- Solar project 918039, Cumberland CountySolar · 74.9 MW · withdrawn
- Battery storage project 956518, Cumberland CountyBattery storage · 50.0 MW · withdrawn
- Other project 132808, Cumberland CountyOther · 38.0 MW · withdrawn
- Solar project 954798, Cumberland CountySolar · 31.6 MW · withdrawn
- Solar project 8359, Cumberland CountySolar · 30.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem