ONSHORE WIND · WESTOnshore wind project GI-0920a, Bon Homme County
Onshore wind project GI-0920a, Bon Homme County is a 80.0 MW onshore wind request built and operating in the West interconnection queue, in Bon Homme County, South Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Request details
- Queue ID
- GI-0920a
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Developer
- B&H Wind, LLC
- Connection point (POI)
- Tripp Junction 115kV
- Location
- Bon Homme County, South Dakota
- Technology
- Wind: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- NRIS and ERIS
- Study phase
- IAE/IS
- Queue status
- Operational
- Entered queue
- 14 July 2009
- Proposed online date
- May 2015
Location
Marker shows the centre of Bon Homme County; the queue data does not give exact sites.
Power plants in South Dakota · Transmission lines in South Dakota
Other requests in Bon Homme County
- Onshore wind project GI-1501, Bon Homme CountyOnshore wind · 200 MW · in study
- Onshore wind project GEN-2015-089, Bon Homme CountyOnshore wind · 200 MW · built
- Onshore wind project 165, Bon Homme CountyOnshore wind · 130 MW · built
- Onshore wind project GI-1216, Bon Homme CountyOnshore wind · 250 MW · withdrawn
- Onshore wind project GI-1306, Bon Homme CountyOnshore wind · 250 MW · withdrawn
- Onshore wind project 109, Bon Homme CountyOnshore wind · 150 MW · withdrawn
- Onshore wind project GI-0920, Bon Homme CountyOnshore wind · 150 MW · withdrawn
- Onshore wind project GI-0919, Bon Homme CountyOnshore wind · 125 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem