πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Wyoming

ONSHORE WIND Β· WEST

Onshore wind project 173, Sweetwater County

Onshore wind project 173, Sweetwater County is a 150 MW onshore wind request withdrawn in the West interconnection queue, in Sweetwater County, Wyoming, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2007 (completed)
  2. Withdrawn / abandonedJul 2013 (project stopped here)
  3. ConsentedMar 2009 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
173
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Developer
Third Planet Windpower, LLC
Connection point (POI)
Firehole substation
Location
Sweetwater County, Wyoming
Technology
Wind: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Study phase
IA signed 3/5/09, Suspended 7/1/10, Terminated 7/2/13
Queue status
Withdrawn
Entered queue
20 November 2007
Agreement signed
5 March 2009
Proposed online date
June 2012
Withdrawn
July 2013

Location

Marker shows the centre of Sweetwater County; the queue data does not give exact sites.

Power plants in Wyoming Β· Transmission lines in Wyoming

Other requests in Sweetwater County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem