WIND + STORAGE Β· WEST

Wind + storage project T2-036, Sweetwater County

Wind + storage project T2-036, Sweetwater County is a 300 MW wind + storage request withdrawn in the West interconnection queue, in Sweetwater County, Wyoming, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2025 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
T2-036
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Anticline substation
Location
Sweetwater County, Wyoming
Technology
Wind: 300 MW Β· Battery
Total requested
300 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
10 September 2025
Proposed online date
December 2027

Location

Marker shows the centre of Sweetwater County; the queue data does not give exact sites.

Power plants in Wyoming Β· Transmission lines in Wyoming

Other requests in Sweetwater County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem