SOLAR Β· MISO

Solar project J1228, Faribault County

Solar project J1228, Faribault County is a 100 MW solar request withdrawn in the MISO interconnection queue, in Faribault County, Minnesota, connecting to ITC MIDWEST.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedNov 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1228
Grid region
MISO (Midcontinent)
Utility / transmission owner
ITC MIDWEST
Connection point (POI)
Huntley 161 kV Substation
Location
Faribault County, Minnesota
Technology
Solar: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA In Process; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
27 April 2019
Proposed online date
September 2023
Withdrawn
November 2019

Location

Marker shows the centre of Faribault County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Faribault County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem