πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

OTHER Β· MISO

Other project G109, Faribault County

Other project G109, Faribault County is a 50.0 MW other request withdrawn in the MISO interconnection queue, in Faribault County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2001 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G109
Grid region
MISO (Midcontinent)
Connection point (POI)
Unknown
Location
Faribault County, Minnesota
Technology
Other: 50.0 MW
Total requested
50.0 MW
Queue status
Withdrawn
Entered queue
20 July 2001
Proposed online date
June 2004

Location

Marker shows the centre of Faribault County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Faribault County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem