United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR + STORAGE Β· WEST

Solar + storage project 2023-G3, San Joaquin County

Solar + storage project 2023-G3, San Joaquin County is a 100 MW solar + storage request withdrawn in the West interconnection queue, in San Joaquin County, California, connecting to WAPA Sierra Nevada.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2023-G3
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Sierra Nevada
Connection point (POI)
New Point 69 kV Substation
Location
San Joaquin County, California
Technology
Solar: 100 MW Β· Battery
Total requested
100 MW
Service type
NRIS and ERIS
Study phase
Withdrawn by Customer via email on 4/24/23.
Queue status
Withdrawn
Entered queue
24 March 2023
Proposed online date
February 2026

Location

Marker shows the centre of San Joaquin County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in San Joaquin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem