United States βΊ Grid βΊ Interconnection queues βΊ New York
ONSHORE WIND Β· NYISOBlue Hill Wind
Blue Hill Wind is a 27.0 MW onshore wind request withdrawn in the NYISO interconnection queue, in Madison County, New York, connecting to NYSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1116
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- Liberty Renewables Inc.
- Connection point (POI)
- Morrisville 46 kV
- Location
- Madison County, New York
- Technology
- Wind: 27.0 MW
- Total requested
- 27.0 MW
- Queue status
- Withdrawn
- Entered queue
- 24 November 2020
Location
Marker shows the centre of Madison County; the queue data does not give exact sites.
Other requests in Madison County
- Oxbow Hill SolarSolar Β· 140 MW Β· in study
- Hoffman Falls WindOnshore wind Β· 72.0 MW Β· in study
- Hoffman Falls Wind 2Onshore wind Β· 29.8 MW Β· in study
- Munnsville - Phase 1Onshore wind Β· 34.5 MW Β· built
- Fenner Wind Energy Fac.Onshore wind Β· 30.0 MW Β· built
- Fenner Wind Energy Fac.Onshore wind Β· 30.0 MW Β· built
- Ditch Creek SolarSolar + storage Β· 200 MW Β· withdrawn
- Ditch CreekSolar + storage Β· 200 MW Β· withdrawn
- Hoffman Falls Wind 2Onshore wind Β· 103 MW Β· withdrawn
- Cazenovia SolarSolar Β· 80.0 MW Β· withdrawn
- Rolling Upland Wind FarmOnshore wind Β· 79.8 MW Β· withdrawn
- Rolling Upland Wind Farm LLCOnshore wind Β· 79.8 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem