πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί North Dakota

ONSHORE WIND Β· MISO

Onshore wind project MPC01900, Cass County

Onshore wind project MPC01900, Cass County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Cass County, North Dakota, connecting to Minnkota Power Cooperative.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
MPC01900
Grid region
MISO (Midcontinent)
Utility / transmission owner
Minnkota Power Cooperative
Connection point (POI)
Maple River 230 kV Substation
Location
Cass County, North Dakota
Technology
Wind: 200 MW
Total requested
200 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
17 April 2008
Proposed online date
March 2012

Location

Marker shows the centre of Cass County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Cass County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem