United States › Grid › Interconnection queues › Louisiana
SOLAR · MISOSolar project J3479, Rapides Parish County
Solar project J3479, Rapides Parish County is a 225 MW solar request in interconnection study in the MISO interconnection queue, in Rapides Parish County, Louisiana, connecting to CLECO POWER.
- PlanningQueued Apr 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Feb 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J3479
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- CLECO POWER
- Connection point (POI)
- Hineston
- Location
- Rapides Parish County, Louisiana
- Technology
- Solar: 225 MW
- Total requested
- 225 MW
- Service type
- Energy only (ERIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Active
- Entered queue
- 12 April 2024
- Proposed online date
- February 2027
Location
Marker shows the centre of Rapides Parish County; the queue data does not give exact sites.
Other requests in Rapides Parish County
- Gas project E0048, Rapides Parish CountyGas · 775 MW · in study
- Solar project J3209, Rapides Parish CountySolar · 350 MW · in study
- Solar project J3014, Rapides Parish CountySolar · 280 MW · in study
- Solar project J2916, Rapides Parish CountySolar · 400 MW · withdrawn
- Solar project J3197, Rapides Parish CountySolar · 250 MW · withdrawn
- Solar project J1220, Rapides Parish CountySolar · 200 MW · withdrawn
- Solar project J2529, Rapides Parish CountySolar · 200 MW · withdrawn
- Solar project J2339, Rapides Parish CountySolar · 125 MW · withdrawn
- Solar project J2470, Rapides Parish CountySolar · 100 MW · withdrawn
- Solar project J3793, Rapides Parish CountySolar · 100 MW · withdrawn
- Solar project J1999, Rapides Parish CountySolar · 100 MW · withdrawn
- Other project J636, Rapides Parish CountyOther · 52.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem