United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
SOLAR Β· MISOSolar project J3197, Rapides Parish County
Solar project J3197, Rapides Parish County is a 250 MW solar request withdrawn in the MISO interconnection queue, in Rapides Parish County, Louisiana, connecting to CLECO POWER.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedMar 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3197
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- CLECO POWER
- Connection point (POI)
- EAST LEESVILLE -RODEMACHER 230
- Location
- Rapides Parish County, Louisiana
- Technology
- Solar: 250 MW
- Total requested
- 250 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 15 September 2022
- Proposed online date
- December 2026
- Withdrawn
- March 2023
Location
Marker shows the centre of Rapides Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in Rapides Parish County
- Gas project E0048, Rapides Parish CountyGas Β· 775 MW Β· in study
- Solar project J3209, Rapides Parish CountySolar Β· 350 MW Β· in study
- Solar project J3014, Rapides Parish CountySolar Β· 280 MW Β· in study
- Solar project J3479, Rapides Parish CountySolar Β· 225 MW Β· in study
- Solar project J2916, Rapides Parish CountySolar Β· 400 MW Β· withdrawn
- Solar project J1220, Rapides Parish CountySolar Β· 200 MW Β· withdrawn
- Solar project J2529, Rapides Parish CountySolar Β· 200 MW Β· withdrawn
- Solar project J2339, Rapides Parish CountySolar Β· 125 MW Β· withdrawn
- Solar project J2470, Rapides Parish CountySolar Β· 100 MW Β· withdrawn
- Solar project J3793, Rapides Parish CountySolar Β· 100 MW Β· withdrawn
- Solar project J1999, Rapides Parish CountySolar Β· 100 MW Β· withdrawn
- Other project J636, Rapides Parish CountyOther Β· 52.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem