Solar + storage project AG1-194, Fayette County

Solar + storage project AG1-194, Fayette County is a 79.0 MW solar + storage request withdrawn in the PJM interconnection queue, in Fayette County, West Virginia, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2020 (completed)
  2. Withdrawn / abandonedJan 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG1-194
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Developer
Keeneys Creek Solar I, LLC
Connection point (POI)
Nuttall 138 kV
Location
Fayette County, West Virginia
Technology
Solar: 79.0 MW Β· Battery
Total requested
79.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
18 September 2020
Proposed online date
December 2023
Withdrawn
January 2025

Location

Marker shows the centre of Fayette County; the queue data does not give exact sites.

Power plants in West Virginia Β· Transmission lines in West Virginia

Other requests in Fayette County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem