United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
GAS Β· PJMGas project U2-099, Northampton County
Gas project U2-099, Northampton County is a 700 MW gas request withdrawn in the PJM interconnection queue, in Northampton County, Pennsylvania, connecting to PPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2008 (completed)
- Withdrawn / abandonedNov 2009 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- U2-099
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PPL
- Connection point (POI)
- Martins Creek 230kV
- Location
- Northampton County, Pennsylvania
- Technology
- Gas: 700 MW
- Total requested
- 700 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 31 July 2008
- Proposed online date
- May 2014
- Withdrawn
- November 2009
Location
Marker shows the centre of Northampton County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Northampton County
- Solar + storage project AI1-152, Northampton CountySolar + storage Β· 19.9 MW Β· in study
- BethlehemGas Β· 750 MW Β· built
- Lower Mt BethelGas Β· 600 MW Β· built
- Conectiv Bethlem CT 6, ST2Gas Β· 350 MW Β· built
- Lower Mount BethelGas Β· 86.6 MW Β· built
- Bethlehem Gen Facility Units 1 - 8Gas Β· 42.0 MW Β· built
- Lower Mount BethelGas Β· 33.0 MW Β· built
- Martins Creek #3Coal Β· 30.0 MW Β· built
- Martins Creek #4Coal Β· 30.0 MW Β· built
- Grand Central Sanitary LFOther Β· 10.0 MW Β· built
- Portland Station Unit 5Gas Β· 6.5 MW Β· built
- Bethlehem LFOther Β· 5.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem