United States › Grid › Interconnection queues › California
BATTERY STORAGE · WESTBattery storage project GI-2022-153, Riverside County
Battery storage project GI-2022-153, Riverside County is a 100 MW battery storage request in interconnection study in the West interconnection queue, in Riverside County, California, connecting to Imperial Irrigation District.
- PlanningQueued Jan 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Mar 2024 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GI-2022-153
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Imperial Irrigation District
- Connection point (POI)
- Ave 42 Substation
- Location
- Riverside County, California
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Study phase
- System Impact Study
- Queue status
- Active
- Entered queue
- 28 January 2022
- Proposed online date
- March 2024
Location
Marker shows the centre of Riverside County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Riverside County
- OberonSolar + storage · 1,037 MW · agreement signed
- Grace Energy CenterSolar + storage · 1,017 MW · agreement signed
- EasleySolar + storage · 940 MW · agreement signed
- Athos Power PlantSolar + storage · 908 MW · agreement signed
- Lycan SolarSolar + storage · 800 MW · agreement signed
- Calypso SolarSolar + storage · 800 MW · agreement signed
- Menifee Power BankBattery storage · 680 MW · agreement signed
- Twin Palms SolarSolar + storage · 576 MW · agreement signed
- RedondaSolar + storage · 542 MW · agreement signed
- CobaltSolar + storage · 513 MW · agreement signed
- Double Butte StorageBattery storage · 508 MW · agreement signed
- Lake Elsinore Advanced Pumped Storage ProjectBattery storage · 500 MW · agreement signed
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem