SOLAR + STORAGE Β· SOUTHEASTSolar + storage project 329, St Johns County
Solar + storage project 329, St Johns County is a 74.5 MW solar + storage request withdrawn in the Southeast interconnection queue, in St Johns County, Florida, connecting to Florida Power & Light.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2018 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingDec 2023 (not reached)
- Closed (not reached)
Request details
- Queue ID
- 329
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Florida Power & Light
- Developer
- Third Party
- Connection point (POI)
- Millcreek-Tocoi 230kV
- Location
- St Johns County, Florida
- Technology
- Solar: 74.5 MW Β· Battery
- Total requested
- 74.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- Facility Study
- Queue status
- Withdrawn
- Entered queue
- 30 January 2018
- Proposed online date
- December 2023
- Came online
- December 2023
Location
Marker shows the centre of St Johns County; the queue data does not give exact sites.
Other requests in St Johns County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem