United States βΊ Grid βΊ Interconnection queues βΊ Florida
GAS Β· SOUTHEASTGas project 420, St Johns County
Gas project 420, St Johns County is a 744 MW gas request withdrawn in the Southeast interconnection queue, in St Johns County, Florida, connecting to Florida Power & Light.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 420
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Florida Power & Light
- Developer
- Third Party
- Connection point (POI)
- St Augustine
- Location
- St Johns County, Florida
- Technology
- Gas: 744 MW
- Total requested
- 744 MW
- Service type
- Network resource (NRIS)
- Study phase
- Facility Study
- Queue status
- Withdrawn
- Entered queue
- 24 March 2021
- Proposed online date
- April 2027
Location
Marker shows the centre of St Johns County; the queue data does not give exact sites.
Other requests in St Johns County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem