United States βΊ Grid βΊ Interconnection queues βΊ Kansas
ONSHORE WIND Β· SPPOnshore wind project GEN-2009-009, Barton County
Onshore wind project GEN-2009-009, Barton County is a 150 MW onshore wind request withdrawn in the SPP interconnection queue, in Barton County, Kansas, connecting to SUNC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2009 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2009-009
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SUNC
- Connection point (POI)
- Pioneer Tap 115kV
- Location
- Barton County, Kansas
- Technology
- Wind: 150 MW
- Total requested
- 150 MW
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 10 March 2009
- Proposed online date
- September 2011
Location
Marker shows the centre of Barton County; the queue data does not give exact sites.
Other requests in Barton County
- Solar project GEN-2019-054, Barton CountySolar Β· 150 MW Β· suspended
- Battery storage project GEN-2019-068, Barton CountyBattery storage Β· 50.0 MW Β· suspended
- Onshore wind project GEN-2009-010, Barton CountyOnshore wind Β· 200 MW Β· withdrawn
- Gas project GEN-2009-014, Barton CountyGas Β· 151 MW Β· withdrawn
- Solar project GEN-2018-116, Barton CountySolar Β· 150 MW Β· withdrawn
- Battery storage project GEN-2019-051, Barton CountyBattery storage Β· 40.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem